AG00051_.gif (1652 bytes)Project & Logistics

wpe2.jpg (9000 bytes)

wpe5.jpg (31166 bytes)

AG00051_.gif (1652 bytes)redball1.gif (924 bytes)Defilation of Logistics

¡@

Project of MRT Taipei Metro

AG00051_.gif (1652 bytes)redball1.gif (924 bytes)The Letter from Customer - ABB

AG00051_.gif (1652 bytes)redball1.gif (924 bytes)Unloading from the ships after arrival - Kaohsiung

AG00051_.gif (1652 bytes)redball1.gif (924 bytes)The ground handling by Air & Sea Local Operator & Litting Beam Operation

AG00051_.gif (1652 bytes)redball1.gif (924 bytes)preparation of Ground Transportation, survey on Irregularity &major process on record

AG00051_.gif (1652 bytes)redball1.gif (924 bytes)The Strategies of Route & The Safety of Coaches

AG00051_.gif (1652 bytes)redball1.gif (924 bytes)Arriving & Preparing for delivery at Bei-Tou MRT Base

¡@

Project of Lin Kou Generator

AG00051_.gif (1652 bytes)redball1.gif (924 bytes)The letter from Customer - Siemens

AG00051_.gif (1652 bytes)redball1.gif (924 bytes)Build up Temporary Ferry Bay for Barge arrival.

AG00051_.gif (1652 bytes)redball1.gif (924 bytes)Generator Arrived Lin Kou Temporary Port (Prepar for ground transportation).

AG00051_.gif (1652 bytes)redball1.gif (924 bytes)Step by Step the Generator Ready for Departure

AG00051_.gif (1652 bytes)redball1.gif (924 bytes)Finally the Generator Arrived Lin Kou Receiving Center

¡@

Detail of Total Quality control of Service after Arrival

AG00051_.gif (1652 bytes)Step 1   AG00051_.gif (1652 bytes)Step 2 AG00051_.gif (1652 bytes) Step 3 AG00051_.gif (1652 bytes) Step 4   AG00051_.gif (1652 bytes)Step 5

AG00051_.gif (1652 bytes)Step 6     AG00051_.gif (1652 bytes)Step 7  AG00051_.gif (1652 bytes)Step 8  AG00051_.gif (1652 bytes)Step 9   

¡@